Pressemitteilung: Bridge Over Lake Victoria Fully Connected

The main span connection of the Magufuli Bridge in Tanzania, built by China Railway Construction Corporation Limited (CRCC), has been completed. As a result, after more than four years of construction, the longest low-pylon cable-stayed bridge in Africa has now been fully connected. The Magufuli Bridge is a flagship project of China-Africa cooperation under the Belt and Road Initiative and a key national project in Tanzania. Located on the southern shore of Lake Victoria, Africa’s largest lake, the bridge spans 4.66 kilometers, with a dual carriageway designed for speeds of 120 km/h. The main bridge, a 520-meter, three-pylon, dual-cable plane low-pylon cable-stayed structure, consists of 123 sections. (....)

Der vollständige Inhalt dieser Pressemitteilung wird auf unserer Seite nicht angezeigt.
Zum Lesen der Mitteilung klicken Sie bitte auf den folgenden Link:

-> Pressemitteilung: Bridge Over Lake Victoria Fully Connected

Quelle: State-owned Assets Supervision and Administration Commission of the State Council - People’s Republic of China

Schlagwörter: State-owned Assets Supervision and Administration Commission of the State Council - People’s Republic of China, Lake Victoria, main span connection, Magufuli Bridge, Tanzania, China Railway Construction Corporation Limited (CRCC), low-pylon cable-stayed bridge

Kategorie(n): Logistische Infrastruktur